• Franz R. Krimmel v. Environmental Health Officer

    Decision Date:
    1995-07-13
    File Numbers:
    Decision Numbers:
    94/25
    Third Party:
    Disposition:
    BOARD UPHOLDS THE REJECTION OF THE APPLICATION

    Summary

    Decision Date: July 13, 1995

    Panel: David Perry, Bob Radloff, Elinor Turrill

    Mr. Krimmel applied for a permit to build a sewage disposal system. It was refused on the basis that the high water table reached a level within 9 to 10 inches of the surface, that the area was subject to flooding, and that the percolation rate was over 30 minutes, all of which violated the Sewage Disposal Regulation. Mr. Krimmel made no serious effort to contradict these points and the Board upheld the decision of the Health Officer.